Fish Processing Workshop In Seychelles
Date:2018
Location:Seychelles
Scale:About 129㎡
Category:Steel frame agricultural building
Function:Fish processing workshop
Characteristics : Factories in island countries which has strict requirements on anti-corrosion requirements and quality
Project features:
The building has a length of 12 meters, a width of 5.7 meters, a partial mezzanine, a construction area of 129 square meters, and a structural form of a portal frame structure. The first floor is the workshop for product processing and use; the second floor is the office and product storage. Since it is an island country, the project has extremely high requirements on anti-corrosion, and customers have strict requirements on quality. Therefore, all the frames are all hot-dip galvanized, and the connecting screws are all hot-dip galvanized; the roof is 0.6mm colored steel sheet+ 50mm glass wool as insulation + stainless steel wire mesh + aluminum foil paper.
![Design Drawing of Fish Processing Workshop In Seych](https://mlh6fy9trjxo.i.optimole.com/cb:XzHC.64de3/w:1024/h:433/q:mauto/f:best/https://juhesteelstructure.com/wp-content/uploads/2023/05/Design-Drawing-of-Fish-Processing-Workshop-In-Seych.jpg)
![Design Drawing of Fish Processing Workshop In Seych 1](https://mlh6fy9trjxo.i.optimole.com/cb:XzHC.64de3/w:1024/h:433/q:mauto/f:best/https://juhesteelstructure.com/wp-content/uploads/2023/05/Design-Drawing-of-Fish-Processing-Workshop-In-Seych-1.jpg)
![Inner View of Fish Processing Workshop In Seychelle](https://mlh6fy9trjxo.i.optimole.com/cb:XzHC.64de3/w:640/h:400/q:mauto/f:best/https://juhesteelstructure.com/wp-content/uploads/2023/05/Inner-View-of-Fish-Processing-Workshop-In-Seychelle.jpg)
![Fish Processing Workshop In Seychelles](https://mlh6fy9trjxo.i.optimole.com/cb:XzHC.64de3/w:800/h:500/q:mauto/f:best/https://juhesteelstructure.com/wp-content/uploads/2023/05/Fish-Processing-Workshop-In-Seychelles.jpg)
![Stairs of Fish Processing Workshop In Seychelles 1](https://mlh6fy9trjxo.i.optimole.com/cb:XzHC.64de3/w:640/h:400/q:mauto/f:best/https://juhesteelstructure.com/wp-content/uploads/2023/05/Stairs-of-Fish-Processing-Workshop-In-Seychelles-1.jpg)
![Stairs of Fish Processing Workshop In Seychelles 3](https://mlh6fy9trjxo.i.optimole.com/cb:XzHC.64de3/w:640/h:400/q:mauto/f:best/https://juhesteelstructure.com/wp-content/uploads/2023/05/Stairs-of-Fish-Processing-Workshop-In-Seychelles-3.jpg)
![Steel Structure of Fish Processing Workshop In Seyc](https://mlh6fy9trjxo.i.optimole.com/cb:XzHC.64de3/w:640/h:400/q:mauto/f:best/https://juhesteelstructure.com/wp-content/uploads/2023/05/Steel-Structure-of-Fish-Processing-Workshop-In-Seyc.jpg)
![Appearance of Fish Processing Workshop In Seychelles 2](https://mlh6fy9trjxo.i.optimole.com/cb:XzHC.64de3/w:640/h:400/q:mauto/f:best/https://juhesteelstructure.com/wp-content/uploads/2023/05/Appearance-of-Fish-Processing-Workshop-In-Seychelles-2.jpg)