Stairs of Fish Processing Workshop In Seychelles 3

ورشة تجهيز الأسماك في سيشيل

Date:2018          

Location:Seychelles             

Scale:About 129㎡        

Category:Steel frame agricultural building           

Function:Fish processing workshop

Characteristics : Factories in island countries which has strict requirements on anti-corrosion requirements and quality

مميزات المشروع:

The building has a length of 12 meters, a width of 5.7 meters, a partial mezzanine, a construction area of 129 square meters, and a structural form of a portal frame structure. The first floor is the workshop for product processing and use; the second floor is the office and product storage. Since it is an island country, the project has extremely high requirements on anti-corrosion, and customers have strict requirements on quality. Therefore, all the frames are all hot-dip galvanized, and the connecting screws are all hot-dip galvanized; the roof is 0.6mm colored steel sheet+ 50mm glass wool as insulation + stainless steel wire mesh + aluminum foil paper.

Design Drawing of Fish Processing Workshop In Seych
Design Drawing of Fish Processing Workshop In Seych 1
Inner View of Fish Processing Workshop In Seychelle
ورشة تجهيز الأسماك في سيشيل
Stairs of Fish Processing Workshop In Seychelles 1
Stairs of Fish Processing Workshop In Seychelles 3
Steel Structure of Fish Processing Workshop In Seyc
ظهور ورشة تجهيز الأسماك في سيشيل 2

ابقى على تواصل

أعداد

بريد إلكتروني

أرسل لنا رسالة

يرجى تمكين JavaScript في متصفحك لإكمال هذا النموذج.